Migrations in waves, with a tested way back

We move workloads off VMware, out of data centers, between clouds, and out of the cloud when the numbers say so. Every migration starts with a fixed-price assessment (a Platform Health Check from $3,300€2,900£2,500, a VMware Exit Assessment at $6,700€5,800£5,000), runs in waves with a rollback tested before each cutover, and ends with the new platform running under an SLA. A lift-and-shift of up to five servers costs $13,300€11,600£10,000.

  • VMware renewal
  • Smoke tests fail
  • Tested rollback
Migration waves with a tested rollbackTimeline diagram. A pilot wave of a few low-risk VMs comes first and rehearses the rollback. Then waves grouped by dependency follow; three are shown, with the VMware renewal date marked and the waves with the biggest license savings placed before it. After the last wave, the hosts are freed. Every wave runs the same steps: replicate to the target, test on an isolated network, app owner sign-off, a go/no-go check against written criteria, cutover with smoke tests, then hypercare. In this example the smoke tests fail at cutover: the rollback powers the source VM back on and points traffic back to it. The source stays on VMware, powered off but not deleted, until you sign the wave off. After hypercare and your sign-off, the source VMs are removed.TimePilotWave 1Wave 2Wave 3Hosts freedVMware renewalRollback rehearsedBiggest license savings firstThe rest, by dependencyEvery wave runs the same stepsSource VMOn VMware, kept untilyou sign the wave offReplicateto the targetTestisolated networkSign-offby the app ownerGo/no-gowritten criteriaCutoversmoke testsHypercarethen decommissionRollback: power the source on, point traffic backFrom the go/no-go check or a failed smoke testAfter hypercare and yoursign-off, the source VMsare removed.Migration waves with a tested rollbackTimeline diagram. A pilot wave of a few low-risk VMs comes first and rehearses the rollback. Then waves grouped by dependency follow; three are shown, with the VMware renewal date marked and the waves with the biggest license savings placed before it. After the last wave, the hosts are freed. Every wave runs the same steps: replicate to the target, test on an isolated network, app owner sign-off, a go/no-go check against written criteria, cutover with smoke tests, then hypercare. In this example the smoke tests fail at cutover: the rollback powers the source VM back on and points traffic back to it. The source stays on VMware, powered off but not deleted, until you sign the wave off. After hypercare and your sign-off, the source VMs are removed.VMware renewalPilotWave 1Wave 2Wave 3The pilot rehearses the rollback. Thebiggest license savings move beforethe renewal; then the hosts are freed.Every wave runs the same stepsSource VM, on VMwareKept until you sign the wave offReplicateto the targetTestisolated networkSign-offby the app ownerGo/no-gowritten criteriaCutoversmoke testsHypercarethen decommissionRollback: power the source on,point traffic backFrom the go/no-go check or a failedsmoke test. After hypercare and yoursign-off, the source VMs are removed.
The pilot wave rehearses the rollback, so every later wave has a way back that has already worked once.

In this section

Signs you need this

  • The VMware renewal quote arrived, and nobody budgeted for it.
  • The data center lease or the hardware support contract ends on a date you can’t move.
  • You’re on the wrong cloud for your workload, and egress, licensing or a missing service costs you every month.
  • The cloud bill has grown faster than the business, and most of the workloads are steady.
  • A previous migration stalled halfway, and you now pay for both sides.
  • Your Oracle Database license bill is the biggest line in the IT budget.

Migration types

Type What moves Starts with Read more
VMware exit VMs from vSphere to Proxmox, Hyper-V, Nutanix or a cloud VMware Exit Assessment, $6,700€5,800£5,000 for up to 100 VMs VMware exit
Data center exit (lift-and-shift) Servers to AWS, Azure, Google Cloud or Oracle Cloud Discovery, from $6,700€5,800£5,000 Packages and prices
Cloud-to-cloud and replatform Workloads between clouds, modernized on the way Platform Health Check, from $3,300€2,900£2,500 Packages and prices
Cloud repatriation Steady workloads to colocation, on-prem or an EU budget cloud Repatriation Feasibility & TCO, $5,300–$10,600€4,600–€9,300£4,000–£8,000 Cloud repatriation
Oracle Database Oracle Database to OCI, or to Oracle Database@Azure, @AWS or @Google Cloud Fixed quote, $10,600–$53,200€9,300–€46,400£8,000–£40,000 Cloud architecture
Into containers on the way Apps containerized during the move, onto ECS, Container Apps, Cloud Run or Kubernetes $2,000–$4,000€1,750–€3,500£1,500–£3,000 per service Containers without Kubernetes

What you get

  • An inventory and dependency map of everything in scope: what talks to what, and what it actually uses.
  • A strategy for every workload, from the list further down this page, with the reason.
  • The target platform built in code, in your repositories: a landing zone, a hypervisor cluster or a Kubernetes platform.
  • A wave plan, with a runbook for every wave covering the cutover steps, the go/no-go criteria and the rollback.
  • Test evidence for every wave: what was checked, by whom, and the result.
  • A cutover report for every wave, and a hypercare log of everything found and fixed afterwards.
  • A decommission record showing what was switched off and when, so you stop paying for the old side.
  • A handover pack: runbooks, access, monitoring and the first cost report on the new platform.

You get a written fixed quote after the assessment.

Packages and prices

Prices are set per currency and exclude sales tax/VAT and cloud provider charges.

Migrations packages
PackageDurationYou’ll needPrice (excluding sales tax/VAT)
Lift-and-shift migrationDiscovery, then migration of your servers with a cutover plan and hypercare.3–10 weeksDiscovery$13,300€11,600£10,000for up to 5 servers
  • Up to 15 servers: $29,300€25,500£22,000
  • Up to 50 servers: $59,900€52,200£45,000
  • Discovery, from: $6,700€5,800£5,000
VMware Exit AssessmentInventory, dependency mapping, target options (Proxmox, Hyper-V, Nutanix, AWS, Azure), cost comparison and migration waves.2–3 weeksvCenter read access$6,700€5,800£5,000for up to 100 VMs
  • Up to 250 VMs: $12,600€11,000£9,500
VMware Exit MigrationTarget platform build plus migration of each VM, wave by wave, with tested rollback per wave. Minimum 20 VMs.Per waveVMware Exit AssessmentFrom$200€175£150up to $530€465£400 per VM
  • Target platform build: $10,600€9,300£8,000–$26,600€23,200£20,000
Repatriation Feasibility & TCOA cost model for staying in the cloud vs colocation, on-prem or an EU budget cloud, a risk review and a plan.2 weeksBilling dataFrom$5,300€4,600£4,000up to $10,600€9,300£8,000
Cloud-to-cloud or replatformQuoted per workload after a Platform Health Check.Set in the proposalPlatform Health CheckQuoted after a Health Check
Oracle Database to OCI or Database@Azure / AWS / Google CloudLicense model, target design, migration, cutover and a DR option.3–10 weeksDatabase access and your license inventoryFrom$10,600€9,300£8,000up to $53,200€46,400£40,000

Every package, monthly plan and day rate · Compare SLA tiers

How it works: phases and outputs

Phase What happens What you keep
1. Assess Inventory, real utilization, dependencies, licenses and current costs. Every workload gets a strategy Inventory, dependency map, TCO, recommendation
2. Plan Workloads grouped into waves by dependency and risk. Cutover windows chosen. A runbook, a rollback plan and go/no-go criteria agreed for every wave Wave plan, runbooks, rollback plans, test plan
3. Build the target Landing zone or target platform, in code. Networking, identity, backups and monitoring in place before the first workload arrives Terraform or OpenTofu repositories, a working empty platform
4. Pilot wave A small group of low-risk workloads moved end to end, including a rehearsed rollback Pilot report, corrected runbooks
5. Migrate in waves Replicate, test in isolation, app owner sign-off, cutover in the agreed window. If the go/no-go check fails, we roll back A cutover report for every wave
6. Hypercare The engineers who ran the cutover watch the moved workloads and fix what comes up Hypercare log, issues closed
7. Decommission and hand over The old side switched off after your sign-off, then removed. Runbooks and access handed over; the monthly service starts Decommission record, handover pack, first cost report

The strategies, in plain words

Every workload in the assessment gets one of these labels, with the reason. Most environments end up as a mix.

Strategy In plain words When it fits Example
Rehost (lift and shift) Move it as it is Deadline-driven exits; apps you’ll replace later anyway A VM moved unchanged to EC2 or Proxmox
Replatform Move it, and change what it runs on Quick wins with little code change: a managed database, containers, a newer OS A MySQL VM becomes a managed database; an app moves into containers on ECS
Refactor Rebuild parts of it so it runs well in the new place Where the design itself is the cost or reliability problem A batch job rewritten to scale with its queue. Expensive, so only where it pays back
Relocate Move the whole hypervisor environment unchanged, to the same platform somewhere else VMware environments that must leave a data center quickly vSphere to Google Cloud VMware Engine or Oracle Cloud VMware Solution
Repurchase Replace it with a SaaS product Commodity software: email, CRM, ticketing, file shares We move the data across and switch the old system off
Retire Switch it off Things nobody uses. Most environments have a few Old test servers, a reporting VM nobody has opened in years
Retain Leave it where it is, for now Not worth moving yet, or tied to a license or vendor contract A vendor appliance that stays on VMware until its contract ends

Rollback and hypercare

Every wave has a way back, and we test it before we need it.

  • Go/no-go criteria in writing, agreed before the window: what must work, who decides, and by what time.
  • The source stays intact. The original VM or server is switched off, not deleted, until you sign the wave off.
  • Rollback is rehearsed in the pilot wave, and again for any wave that differs from it, such as one with a database.
  • DNS is prepared in advance. Record lifetimes are shortened ahead of the cutover, so traffic can move back quickly.
  • Data has a rollback point. Where data changes after cutover, the runbook says how those changes get back to the source if we roll back.
  • Hypercare follows every cutover: the engineers who ran it stay on it for [hypercare length], then hand over to the monthly service.

Technology

  • Cloud migration tools: AWS Application Migration Service, Azure Migrate, Google Migrate to Virtual Machines, Oracle Cloud Migrations
  • Hypervisor moves: VMware HCX, Proxmox ESXi import, virt-v2v, Nutanix Move
  • Databases: Oracle Data Guard and Zero Downtime Migration, PostgreSQL logical replication, MySQL replication, native dump and restore
  • Files and objects: rsync, rclone, provider transfer services
  • Target platforms: landing zones on AWS, Azure, Google Cloud and Oracle Cloud; Proxmox VE; Hyper-V; Kubernetes
  • Code: Terraform or OpenTofu, Ansible, Packer golden images

When you don’t need this

  • One or two servers. That’s a job for the platform hours bank ($870€750£650 a month for 5 hours), not a migration project.
  • You want to move because the bill is high, but nobody has optimized it yet. Start with a FinOps Quick-Win Audit ($4,000–$8,000€3,500–€7,000£3,000–£6,000). Sometimes the cheaper move is to stay. See FinOps.
  • The app is being rebuilt anyway. Build the new one on the new platform and retire the old one; don’t migrate both.
  • The deadline comes from a vendor’s sales team, not a contract. Check the contract first. The assessment includes a licensing read.

After the migration

The new platform hands over to a monthly service with an SLA:

  • Managed cloud from $1,000€870£750 a month plus a sliding percentage of cloud spend
  • Managed VMs at $60€52£45 per Linux VM and $80€70£60 per Windows VM a month, minimum $600€520£450
  • Managed Kubernetes from $1,600€1,400£1,200 a month
  • DR & Backup Implementation with a tested failover runbook, $8,000–$20,000€7,000–€17,400£6,000–£15,000
  • A FinOps review once the first full bills on the new platform arrive, because the bill after a migration is usually the next problem. FinOps Quick-Win Audit $4,000–$8,000€3,500–€7,000£3,000–£6,000

The default SLA is Essential, with Business and Extended available. See Managed services and our SLA page.

Case studies

Engagements led by Cloudsnap’s founding engineer. Client names are withheld.

Questions

How much downtime will we have?
It depends on the workload and the replication method, and you'll see it per wave in the plan before you sign. Most VMs and servers cut over in a short agreed window. Databases with replication can usually switch over with very little downtime. Nothing cuts over outside a window you've approved.
Can you migrate if we don't have a landing zone?
Yes. We build it first, in code: AWS from $10,600€9,300£8,000; Azure, Google Cloud and Oracle Cloud from $8,000€7,000£6,000. It's part of the same fixed quote. See Cloud architecture and landing zones.
What happens if a wave fails?
We roll back using the rehearsed runbook; the source was never deleted. Then we find the cause, fix the runbook and run the wave again in a new window you approve.
Who tests the applications?
Your app owners sign off each wave, because they know what "working" means for their systems. We write the test plan with them, give them an isolated copy to test before cutover, and run the infrastructure checks ourselves.
How do you price a migration?
At a fixed price, after the assessment. VMware moves are priced per VM, lift-and-shift by the number of servers, and cloud-to-cloud per workload. The bands on this page give you the range; only the assessment has a firm price before we've seen your environment.
Can we keep some workloads where they are?
Yes. "Retain" is a real outcome, not a failure. Some systems are better left until a contract ends or a replacement is ready.