Leave VMware on your terms, wave by wave, with tested rollback

We assess your VMware environment, compare the destinations that make sense for it, and move your VMs in waves, with a rollback tested before every cutover. The VMware Exit Assessment costs $6,700€5,800£5,000 for up to 100 VMs; migration costs $200–$530€175–€465£150–£400, plus the build of the target platform.

  • How the VMs move
  • A later step
VMware exit: the destinations, and what moves the VMsBranching diagram. Your VMs on VMware vSphere can move to six destinations in three groups. Your own hardware: Proxmox VE, moved with Proxmox's ESXi import or virt-v2v, for the lowest license cost and Linux-heavy estates; Microsoft Hyper-V, moved with Microsoft's conversion tooling, for Windows-heavy environments already licensed with Windows Server Datacenter; Nutanix AHV, moved with Nutanix Move, a hyperconverged platform close to vSphere. Cloud: AWS, moved with AWS Application Migration Service, for a data center exit or apps that will use cloud services; Azure, moved with Azure Migrate, for Microsoft estates using Azure Hybrid Benefit. The bridge: Google Cloud VMware Engine or Oracle Cloud VMware Solution, moved with VMware HCX, to leave the data center fast while keeping VMware tooling; it needs your own VCF license, and a later step moves the VMs on to native cloud VMs.VMware vSphereYour VMs todayYour own hardwareCloudBridge, then nativeESXi import, virt-v2vProxmox VELowest license cost; Linux-heavy estatesMicrosoft conversion toolingMicrosoft Hyper-VWindows-heavy, Datacenter-licensedNutanix MoveNutanix AHVHyperconverged, close to vSphereApplication Migration ServiceAWSData center exit, cloud servicesAzure MigrateAzureMicrosoft estates, Azure Hybrid BenefitVMware HCXGoogle Cloud VMware Engineor Oracle Cloud VMware SolutionLeave fast; needs your VCF licenseNative VMs, laterVMware exit: the destinations, and what moves the VMsBranching diagram. Your VMs on VMware vSphere can move to six destinations in three groups. Your own hardware: Proxmox VE, moved with Proxmox's ESXi import or virt-v2v, for the lowest license cost and Linux-heavy estates; Microsoft Hyper-V, moved with Microsoft's conversion tooling, for Windows-heavy environments already licensed with Windows Server Datacenter; Nutanix AHV, moved with Nutanix Move, a hyperconverged platform close to vSphere. Cloud: AWS, moved with AWS Application Migration Service, for a data center exit or apps that will use cloud services; Azure, moved with Azure Migrate, for Microsoft estates using Azure Hybrid Benefit. The bridge: Google Cloud VMware Engine or Oracle Cloud VMware Solution, moved with VMware HCX, to leave the data center fast while keeping VMware tooling; it needs your own VCF license, and a later step moves the VMs on to native cloud VMs.VMware vSphereYour VMs todayYour own hardwareProxmox VEMoves with ESXi import, virt-v2vLowest license cost; Linux-heavy estatesMicrosoft Hyper-VMoves with Microsoft conversion toolingWindows-heavy, Datacenter-licensedNutanix AHVMoves with Nutanix MoveHyperconverged, close to vSphereCloudAWSMoves with Application Migration ServiceData center exit, cloud servicesAzureMoves with Azure MigrateMicrosoft estates, Azure Hybrid BenefitBridge, then nativeGCVE or OCVS (bridge)Moves with VMware HCXLeave fast; needs your VCF licenseGCVE: Google Cloud VMware Engine. OCVS:Oracle Cloud VMware Solution. Native VMs later.
There is no single right answer. The assessment compares these destinations with your own inventory, licenses and costs, then recommends one per group of workloads.

The renewal shock, in numbers

  • 59% saw VMware price rises above 25%.
  • 86% are reducing their VMware use.
  • 4% have fully migrated.

Source: CloudBolt survey of 302 IT decision-makers at North American organizations, published February 2026, reported by CIO Dive and Network World.

Broadcom has ended perpetual VMware licenses and moved customers to subscriptions, and has withdrawn vSphere Foundation in parts of EMEA (sources: Broadcom; The Register, December 2025).

Leaving costs money too. Gartner puts external VMware migration services at $300–$3,000 per VM (The Register, January 21, 2025). Our migration price is $200–$530€175–€465£150–£400, fixed for every wave before work starts.

Estimator

Estimate a VMware exit

Move the slider to your VM count. A VMware exit is three prices: the assessment, the target platform build and the migration of each VM, wave by wave with a tested rollback. Where a VM lands in the per-VM range depends on its dependencies, disks and hardware.

  • VMware Exit Assessment: $6,700€5,800£5,000 up to 100 VMs, $12,600€11,000£9,500 up to 250 VMs.
  • Target platform build: $10,600–$26,600€9,300–€23,200£8,000–£20,000.
  • Migration: $200–$530€175–€465£150–£400 per VM, minimum 20 VMs.

Estimate only, the written proposal governs. Prices are set per currency and exclude sales tax/VAT and cloud provider charges.

Signs you need this

  • The renewal quote is several times last year’s, with a core minimum you don’t use.
  • You’re being moved onto a bundle you didn’t ask for.
  • Hardware support on the hosts runs out soon, and you don’t want to buy new hosts just for VMware.
  • Your vSphere version is out of support, or close to it.
  • You want to leave but don’t know which destination costs least for your workloads.
  • A previous attempt moved the easy VMs and stalled on the rest.

What the assessment covers

$6,700€5,800£5,000 for up to 100 VMs, $12,600€11,000£9,500 for up to 250 VMs. 2–3 weeks. We need read-only access to vCenter, or an RVTools export. Larger environments are quoted.

  • Inventory: every VM, host, datastore and network, from read-only vCenter access or an RVTools export.
  • Right-sizing: what each VM actually uses compared with what it’s allocated, so you don’t pay to migrate waste.
  • Dependency mapping: which VMs talk to which, so related systems move in the same wave.
  • Licensing read: Windows Server, SQL Server and Oracle licenses on VMware today, and what changes on each destination.
  • Destinations compared: Proxmox, Hyper-V, Nutanix, AWS and Azure, plus the Google Cloud VMware Engine or Oracle Cloud VMware Solution bridge where it fits.
  • TCO for each destination: hardware or cloud, licenses, migration and running costs.
  • Wave plan: VMs grouped by dependency and risk, with a pilot wave first.
  • Risk register and recommendation: a written report you can take to the board, an editable cost model you keep, and a readout session with your team.

If the right answer turns out to be leaving the cloud rather than moving to it, the Repatriation Feasibility & TCO study ($5,300–$10,600€4,600–€9,300£4,000–£8,000) covers that side. See Cloud repatriation.

Destinations compared

There’s no single right answer. A small Windows environment already licensed for Hyper-V and a large Linux environment on aging hosts end up in different places.

Destination Good fit when Watch out for How VMs move
Proxmox VE You want to keep your own hardware at the lowest license cost; Linux-heavy environments; small and mid-sized teams Open source with optional paid support subscriptions per socket. Fewer third-party integrations than vSphere; check your backup tool supports it Proxmox’s ESXi import, virt-v2v; Proxmox Backup Server for backups
Microsoft Hyper-V Windows-heavy environments already licensed with Windows Server Datacenter; Microsoft skills in-house The management tools (Windows Admin Center, System Center) work differently from vCenter; Linux guests need more care Microsoft’s conversion tooling, or backup and restore to the new host
Nutanix AHV You want a hyperconverged platform with vendor support and day-to-day operations close to vSphere and vSAN Subscription licensing and certified hardware; another vendor relationship to manage Nutanix Move
AWS A data center exit with no hardware refresh, or apps that will use cloud services Steady VMs can cost more than on your own hardware; Windows and SQL Server licensing; needs a landing zone AWS Application Migration Service
Azure Microsoft environments, where Azure Hybrid Benefit reuses your Windows Server and SQL Server licenses (with Software Assurance) The same as AWS: a landing zone first, and the running cost of steady VMs Azure Migrate
Google Cloud VMware Engine / Oracle Cloud VMware Solution (bridge) You must leave the data center fast and keep your VMware tooling for now Needs your own VCF license. It’s still VMware, in someone else’s data center, so the plan has to include moving to native VMs later VMware HCX, then Migrate to Virtual Machines or Oracle Cloud Migrations for the native step

Pricing

The assessment, the per-VM migration, the target platform build, the bridge option and running the VMs afterwards are all in the packages table. The target platform is a Proxmox, Hyper-V or Nutanix cluster built in code ($10,600–$26,600€9,300–€23,200£8,000–£20,000); for a cloud destination it’s a landing zone (see Cloud architecture). Migration has a minimum of 20 VMs and is fixed per wave, with tested rollback in every wave. The bridge to Google Cloud VMware Engine or Oracle Cloud VMware Solution costs $16,000–$39,900€13,900–€34,800£12,000–£30,000 plus $160–$400€140–€350£120–£300 and needs your own VCF license.

What moves a VM within the per-VM range. A simple Linux VM with no dependencies sits at the bottom. A Windows server tied to Active Directory, a database that needs replication to keep downtime short, a vendor appliance, very large disks or special hardware (USB license dongles, GPUs, raw device mappings) sit toward the top. The fixed quote shows the price for every wave before work starts. Our prices also exclude hardware and licenses.

Packages and prices

Prices are set per currency and exclude sales tax/VAT and cloud provider charges.

VMware exit packages
PackageDurationYou’ll needPrice (excluding sales tax/VAT)
VMware Exit AssessmentInventory, dependency mapping, target options (Proxmox, Hyper-V, Nutanix, AWS, Azure), cost comparison and migration waves.2–3 weeksvCenter read access$6,700€5,800£5,000for up to 100 VMs
  • Up to 250 VMs: $12,600€11,000£9,500
VMware Exit MigrationTarget platform build plus migration of each VM, wave by wave, with tested rollback per wave. Minimum 20 VMs.Per waveVMware Exit AssessmentFrom$200€175£150up to $530€465£400 per VM
  • Target platform build: $10,600€9,300£8,000–$26,600€23,200£20,000
VMware bridge to Google Cloud VMware Engine or Oracle Cloud VMware SolutionTarget build, migration waves, then a roadmap to native VMs. Needs your own VCF license.Per waveVMware Exit Assessment and your own VCF licenseFrom$16,000€13,900£12,000up to $39,900€34,800£30,000
  • Per VM: $160€140£120–$400€350£300 per VM
Managed VMsCloud or on-prem VMs. OS patching to our remediation targets, monitoring, backup verification and CIS drift checks.——$60€52£45per VM a monthper Linux VM
  • Per Windows VM: $80€70£60 per VM a month
  • Minimum: $600€520£450 a month

Every package, monthly plan and day rate · Compare SLA tiers

Waves with tested rollback

  1. Pilot wave. A handful of low-risk VMs moved end to end, including a rehearsed rollback. We fix the runbook before anything important moves.
  2. Waves by dependency. VMs that talk to each other move together. Every wave has a runbook, a cutover window and go/no-go criteria agreed in advance.
  3. Replicate and test. VMs are copied or replicated to the target, booted on an isolated network and checked by your app owner before cutover.
  4. Cutover. Final sync, traffic switched, smoke tests run against the agreed checklist.
  5. Rollback ready. The source VM stays on VMware, powered off but not deleted, until you sign the wave off. Rolling back means powering it on and pointing traffic back, and we’ve already practiced it in the pilot.
  6. Hypercare, then decommission. We watch the moved VMs for [hypercare length], then remove the source VMs and free up the hosts.

Plan the waves around your renewal date. Whatever is still on VMware at renewal sets the size of the next bill, so the wave plan puts the biggest license savings first.

  • VMware renewal
  • Smoke tests fail
  • Tested rollback
Migration waves with a tested rollbackTimeline diagram. A pilot wave of a few low-risk VMs comes first and rehearses the rollback. Then waves grouped by dependency follow; three are shown, with the VMware renewal date marked and the waves with the biggest license savings placed before it. After the last wave, the hosts are freed. Every wave runs the same steps: replicate to the target, test on an isolated network, app owner sign-off, a go/no-go check against written criteria, cutover with smoke tests, then hypercare. In this example the smoke tests fail at cutover: the rollback powers the source VM back on and points traffic back to it. The source stays on VMware, powered off but not deleted, until you sign the wave off. After hypercare and your sign-off, the source VMs are removed.TimePilotWave 1Wave 2Wave 3Hosts freedVMware renewalRollback rehearsedBiggest license savings firstThe rest, by dependencyEvery wave runs the same stepsSource VMOn VMware, kept untilyou sign the wave offReplicateto the targetTestisolated networkSign-offby the app ownerGo/no-gowritten criteriaCutoversmoke testsHypercarethen decommissionRollback: power the source on, point traffic backFrom the go/no-go check or a failed smoke testAfter hypercare and yoursign-off, the source VMsare removed.Migration waves with a tested rollbackTimeline diagram. A pilot wave of a few low-risk VMs comes first and rehearses the rollback. Then waves grouped by dependency follow; three are shown, with the VMware renewal date marked and the waves with the biggest license savings placed before it. After the last wave, the hosts are freed. Every wave runs the same steps: replicate to the target, test on an isolated network, app owner sign-off, a go/no-go check against written criteria, cutover with smoke tests, then hypercare. In this example the smoke tests fail at cutover: the rollback powers the source VM back on and points traffic back to it. The source stays on VMware, powered off but not deleted, until you sign the wave off. After hypercare and your sign-off, the source VMs are removed.VMware renewalPilotWave 1Wave 2Wave 3The pilot rehearses the rollback. Thebiggest license savings move beforethe renewal; then the hosts are freed.Every wave runs the same stepsSource VM, on VMwareKept until you sign the wave offReplicateto the targetTestisolated networkSign-offby the app ownerGo/no-gowritten criteriaCutoversmoke testsHypercarethen decommissionRollback: power the source on,point traffic backFrom the go/no-go check or a failedsmoke test. After hypercare and yoursign-off, the source VMs are removed.
The pilot wave rehearses the rollback, so every later wave has a way back that has already worked once.

Technology

  • Discovery: vCenter, RVTools, network flow data
  • Destinations: Proxmox VE with Proxmox Backup Server, Hyper-V with Windows Admin Center or System Center, Nutanix AHV, AWS, Azure, Google Cloud VMware Engine, Oracle Cloud VMware Solution
  • Migration tools: Proxmox ESXi import, virt-v2v, Nutanix Move, AWS Application Migration Service, Azure Migrate, VMware HCX, Google Migrate to Virtual Machines, Oracle Cloud Migrations
  • Code: Terraform or OpenTofu (Proxmox and vSphere providers), Ansible, Packer golden images

When you don’t need this

  • Your renewal is affordable and the platform works. Keep it, and look again before the next renewal.
  • You have fewer than 20 VMs. The per-VM price has a 20-VM minimum. A small environment usually fits a lift-and-shift band ($13,300€11,600£10,000 for up to five servers) or the platform hours bank ($870€750£650 a month for 5 hours).
  • You want to stay on VMware and pay less. We’re engineers, not licensing brokers; a licensing specialist will serve you better.
  • Everything is about to be rebuilt as cloud-native anyway. Skip the VM migration and plan the rebuild. See Migrations.

After the migration

  • Managed VMs: $60€52£45 per Linux VM and $80€70£60 per Windows VM a month, minimum $600€520£450, with the Essential SLA. Patching to the remediation deadlines, monitoring, backup checks.
  • VM Fleet Baseline: golden images with Packer, Ansible configuration, automated patching and a CIS baseline, $5,300–$13,300€4,600–€11,600£4,000–£10,000. See Platform engineering.
  • DR & Backup Implementation with a tested failover runbook: $8,000–$20,000€7,000–€17,400£6,000–£15,000.
  • Quarterly DR test: $1,000€870£750 a quarter.

Questions

How long does a VMware exit take?
The assessment takes 2–3 weeks. The migration timeline depends on the number of waves and the cutover windows you can give us; the wave plan in the assessment has dates, so you know before you sign.
Should we sign a short renewal to buy time?
That's a commercial decision, and it's yours. What we give you is the migration timeline and the number of VMs left at each point, so you can size any renewal to what you'll actually still be running.
Can we keep some VMs on VMware?
Yes. Some systems are better left until a vendor contract ends or a replacement is ready. The assessment marks those as "retain" and costs what's left.
Do you need access to production during the assessment?
Only read-only access to vCenter, or an RVTools export if you'd rather not grant access. We change nothing during the assessment.
What happens to our backups?
The assessment checks whether your backup tool supports the destination. If it doesn't, the plan includes the switch, for example to Proxmox Backup Server, and a restore test before the first wave.
Are you tied to a vendor?
No. We're independent, and we're paid for engineering, not for licenses. The assessment recommends the destination that fits your environment, and shows the numbers for the others.

Know your exit cost before the next renewal

Book a 30-minute call with an engineer. Bring your VM count and renewal date.

Or email hello@cloudsnap.io. We reply within one business day.