Cloud repatriation: a clear yes or no, with numbers
We work out whether moving some or all of your workloads from AWS, Azure or Google Cloud to colocation, your own data center or an EU budget cloud would save money, and what it would cost and risk to get there. The Repatriation Feasibility & TCO study takes 2 weeks and costs $5,300–$10,600€4,600–€9,300£4,000–£8,000. If the answer is no, we'll say so.
Signs you need this
- Your cloud bill grows every quarter, and your traffic doesn’t.
- Most of your spend is compute and storage that runs flat out all month.
- Egress charges are one of the biggest lines on the bill.
- Data residency or sovereignty rules push you toward hardware you control.
- Your committed-spend agreement is up for renewal, and you want options before you sign.
- Someone on the board has read about 37signals and wants to know whether it applies to you.
The 37signals example, and what it doesn’t prove
37signals, the company behind Basecamp and HEY, cut its cloud bill from $3.2M to $1.3M a year after leaving the cloud (source: David Heinemeier Hansson, HEY World, October 17, 2024).
Worth knowing before you quote it in a board meeting: 37signals has steady, predictable load and its own operations engineers, and it bought its own servers and put them in colocation. Their result shows what’s possible for that profile. It doesn’t tell you what you’ll save. Your own bill does, and that’s what the study is for.
Packages and prices
Prices are set per currency and exclude sales tax/VAT and cloud provider charges.
| Package | Duration | You’ll need | Price (excluding sales tax/VAT) |
|---|---|---|---|
| Repatriation Feasibility & TCOA cost model for staying in the cloud vs colocation, on-prem or an EU budget cloud, a risk review and a plan. | 2 weeks | Billing data | From$5,300€4,600£4,000up to $10,600€9,300£8,000 |
| Self-hosted Kubernetesk3s, RKE2 or Talos HA cluster (3–6 nodes) on your hardware, with Velero backups, GitOps, Longhorn or Rook-Ceph storage and MetalLB. | 3–6 weeks | Hardware or a hypervisor | From$16,000€13,900£12,000up to $39,900€34,800£30,000 |
| VM Fleet BaselinePacker golden images, Ansible configuration, automated patching, CIS baseline and an inventory. | 2–3 weeks | Admin access | From$5,300€4,600£4,000up to $13,300€11,600£10,000 |
Every package, monthly plan and day rate · Compare SLA tiers
What the feasibility study covers
$5,300–$10,600€4,600–€9,300£4,000–£8,000. 2 weeks. We need your billing data and read-only access to the accounts in scope.
- Bill analysis: your billing export (AWS Cost and Usage Report, Azure Cost Management, Google Cloud billing export), split by workload and by how steady its load is.
- Workload classification: what depends on managed services you’d have to replace or run yourself, and what could move today.
- A stay-and-optimize baseline: what the cloud bill would be after rightsizing and commitments, so we compare against a realistic cloud cost, not today’s waste.
- Destinations costed: colocation, on-prem and an EU budget cloud, plus a cheaper cloud where your workload suits one.
- The full cost model: servers or hardware, rack space and power, connectivity, licenses, backup and DR, the people who run it (yours, or ours on a managed plan), the one-off migration, data transfer for the move and the hardware refresh.
- Risk review: skills, on-call, DR, compliance evidence, contract terms and commitments still running.
- The answer: yes, no, or partly (and which workloads), with the numbers behind it.
- A plan, if the answer is yes: target design, wave plan and timeline.
What you keep: a written decision memo, the cost model as a spreadsheet you can edit, a workload inventory with a recommendation for each workload, a risk register and the migration plan.
The migration itself is priced after the study: per workload, or per VM where the source is VMware. Our prices also exclude hardware and hosting.
Where workloads can go
| Destination | What it means | Good fit | Watch out for |
|---|---|---|---|
| Colocation | Your servers in someone else’s data center. They provide space, power, cooling and connectivity; you own the hardware | Steady workloads at scale; the 37signals model | Upfront hardware cost, delivery lead times, remote hands, the refresh cycle |
| On-premises | Your servers in your own building | An existing server room, data that must stay on site, factories and edge sites | Power, cooling, physical security and connectivity are all yours |
| EU budget cloud (Hetzner, OVHcloud) | Rented dedicated servers or VMs at monthly prices, in EU data centers | Much of the saving with none of the hardware; no upfront cost | Fewer managed services, so you run your own databases and storage; support works differently from a hyperscaler |
| A cheaper cloud | Moving to another cloud whose pricing suits your workload | Egress-heavy workloads: OCI includes the first 10 TB of internet egress a month free in UK, EU and North American regions | It’s still a migration, and you need to check every service you use has an equivalent |
Whichever you choose, we build it in code and can run it: Proxmox or bare-metal Kubernetes with Talos or RKE2 on your own hardware, k3s, RKE2 or Talos clusters and VMs on an EU budget cloud, and backups written to a separate site or provider.
How it works
- Discovery call. 30 minutes with an engineer. We check whether a study is worth your money, or whether a FinOps audit comes first.
- Data. You share the billing export and read-only access to the accounts in scope.
- Working sessions with your engineers to classify workloads: what’s steady, what’s spiky, and what’s tied to a managed service.
- Model and risks. We cost every destination against the optimized cloud baseline and write up the risks.
- Readout. Yes, no or partly, with the numbers, presented to your team and, if you like, your board.
- If yes: a fixed quote for the migration, built from the plan.
Technology
- Cost data: AWS Cost and Usage Report, Azure Cost Management exports, Google Cloud billing export, OpenCost for Kubernetes cost allocation
- Targets: Proxmox VE, Talos Linux, RKE2, k3s, Hetzner, OVHcloud, Oracle Cloud
- Storage and backup: Longhorn, Rook-Ceph, Velero, Proxmox Backup Server, restic, Borg
- Code and operations: Terraform or OpenTofu, Ansible, Argo CD or Flux, Prometheus, Grafana, Loki
When you don’t need this
We’ll tell you to stay in the cloud if these describe you:
- Spiky or seasonal demand. You’d buy hardware for the peak and leave it idle the rest of the year.
- Deep use of managed services such as DynamoDB, BigQuery, Cosmos DB, Lambda or managed AI services, with no self-hosted equivalent you’d want to run.
- A small bill. Hardware, colocation and the people to run them cost money. Below a certain bill, the savings don’t cover them.
- Nobody to own the hardware: disk failures, firmware, spares, the refresh cycle. An EU budget cloud solves this one; colocation and on-prem don’t.
- You haven’t optimized yet. Rightsizing and commitments often close much of the gap. Start with a FinOps Quick-Win Audit ($4,000–$8,000€3,500–€7,000£3,000–£6,000). See FinOps.
- Fast growth, or new regions coming. Owning capacity is a bet on how much you’ll need.
- Commitments still running. A committed-spend agreement or reservations make leaving early expensive. Time the move to the contract.
- Compliance built on your provider’s attestations, which you’d have to rebuild for your own hardware.
- The real problem is the architecture, not the price. A design that’s expensive in the cloud is usually slow and painful on your own hardware too.
If several of these apply, the study will probably say stay, optimize, or move only part of the environment. And if you’ve already decided and only need it built, skip the study and go straight to Self-hosted Kubernetes.
After the move
Your own hardware still needs someone on call.
- Managed Kubernetes: $1,600€1,400£1,200 a month for the first cluster, +$800€700£600 each additional. See Managed Kubernetes.
- Managed VMs: $60€52£45 per Linux VM and $80€70£60 per Windows VM a month, minimum $600€520£450.
- DR & Backup Implementation: agreed recovery objectives and a tested failover runbook, $8,000–$20,000€7,000–€17,400£6,000–£15,000.
- Quarterly DR test: $1,000€870£750 a quarter.
Every plan includes the Essential SLA, with Business and Extended available. See our SLA page.
Further reading
- Do you actually need Kubernetes? A decision guide for small teams
Probably not yet. When a managed container service is enough, when Kubernetes earns its keep, and what each costs to build and run.
Questions
Do you earn more if we leave?
Can we move only part of the environment?
How long does a repatriation take?
Won't the egress fees to get our data out be huge?
Do you sell hardware or colocation space?
Who runs it afterwards?
Related services
Migrations
From $13,300€11,600£10,000 for up to 5 servers
Self-hosted Kubernetes
From $16,000€13,900£12,000
Managed Kubernetes
From $1,600€1,400£1,200 a month for the first cluster
VMware exit
From $6,700€5,800£5,000 assessment
FinOps
From $4,000€3,500£3,000
Platform engineering & IaC
From $5,300€4,600£4,000
Find out whether leaving pays, before you commit to anything
A 30-minute call with an engineer. Bring a recent cloud bill.
Or email hello@cloudsnap.io. We reply within one business day.